SIMOGGA suite
SIMOGGA Planner
An advanced planning and scheduling software to visualize, quantify and optimize your production.
Planning and scheduling
A schedule that respects the real limits of the floor
SIMOGGA Planner helps all actors reorganise operations with a minimal amount of data and optimise production with limited resources and constraints. It builds a finite capacity schedule, makes bottlenecks visible and compares scenarios before a decision is applied.
The schedule can include machines, equipment, tools and people, with different shifts and calendars. Travel distances can be integrated so that the plan reflects the layout.
- Decrease lead time by 25 to 75%
- Decrease planning management time by 50 to 75%
- Increase throughput, resource usage and operational agility
- Decrease work in process on the shop floor
- Identify bottlenecks and their causes on a visual schedule
- Compare scenarios before applying the best one
What it is built for
Designed for constrained, high mix production
Planner is made for discrete production with high mix, low volume, complex flows and significant human expertise.
Automatic scheduling
Bring agility to the shop floor and to the commercial department with a generated schedule.
Scenario comparison
Test the influence of decisions quickly and keep the version that performs best.
Bottleneck analysis
Highlight waiting time and trace delays back to machines, operators or resource limits.
Product detail
Features, process and system requirements
Features
- Automatic scheduling for the shop floor and the commercial department.
- Generation of scenarios to compare the influence of different decisions.
- Graphical and visual representation of the schedule and blocking elements.
- Visual analysis of delay causes by machine or operator.
- Integration of travel distances to optimise schedules.
- Tracking of operations and production follow up in real time dashboards.
- Progressive deployment with other systems, databases or as a stand alone tool.
Functions
Data and building
- Set a global shift for the factory and sub shifts for each resource.
- Assign multiple resources to each operation: machine, equipment, tool and people.
Analysis and results
- Simulate production with randomised orders when a full order list is not available.
- Visualize bottlenecks based on waiting time and analyse the causes of delays.
- Redirect workload from bottleneck machines to alternative processes or underused machines.
- Show graphs for each KPI and compare scenarios, data and results.
Constraints
- Customise batches.
- Define schedule priorities such as due date or release date.
Process
- Use data extracted from the ERP or configure new data in the user interface.
- Configure the schedule based on shifts, capacity and resources.
- Launch the scheduler.
- Generate scenarios to compare the influence of different decisions.
- Find and remove bottleneck machines.
- SIMOGGA proposes an optimised schedule, the list of tasks by work centre and the weekly planning.
- Validate the new schedule or layout with the team.
System requirements
SIMOGGA is based on the Qt framework and has been tested on the following platforms:
- Microsoft Windows 10, x86 32 and x64
- Microsoft Windows 8.1, x86 32 and x64
- Microsoft Windows 7 SP1, x86 32 and x64
- Microsoft Windows Vista SP2, x86 32 and x64
- Apple Mac OS X 10.9 Maverick or later, Universal
Other platforms may work but full compatibility cannot be guaranteed. Installation requires 300 MB of free disk space. We recommend 4 GB of memory and a modern processor. A mouse is preferable to a touchpad for graphical editing.
Interested in other solutions?
Part of the SIMOGGA suite
Want to see your own planning case?
Send us an order set or a planning constraint and we will demonstrate the scheduling approach.