SNCB NMBS
SIMOGGA Layout Design and Planner were used to visualize the future layout and simulate planning with shifts, lot sizes, operation distribution and finite capacity constraints such as people and equipment.
| Savings | 1M identified on improvements |
|---|---|
| Lead time | 13.5 days removed |
| Load capacity | 150% increase |
| Workflows | 32% decrease |
| Management workload | 90% decrease |
| Product families | 7 instead of 2000 |
We shared the same commitment to get operations moving forward.