Projects where SIMOGGA and AMIA Systems consulting changed the layout, the plan or the traceability of an industrial operation.

Measured outcomes

Four programmes, four operational constraints

Each case started with a different question: a maintenance line, a factory layout, a steel inventory or a production change. The common thread is a quantified result accepted by the people who run the site.

Rail maintenance

SNCB NMBS

SIMOGGA Layout Design and Planner were used to visualize the future layout and simulate planning with shifts, lot sizes, operation distribution and finite capacity constraints such as people and equipment.

Savings1M identified on improvements
Lead time13.5 days removed
Load capacity150% increase
Workflows32% decrease
Management workload90% decrease
Product families7 instead of 2000
We shared the same commitment to get operations moving forward.
S. Corneillie, Implementation Responsible, SNCB NMBS
Read the project article
Aerospace and defence

Factory layout programme

New layouts were produced with a graphical material handling system that optimises a factory layout based on a global material flow analysis. The user friendliness of SIMOGGA supported a collaborative approach with all actors involved in the change.

Flows40% decrease within the production unit
Management workload90% decrease
Product familiesFrom 2000 to 7
Customer locationWallonia Region, Belgium

Keys to success included 2D factory layouts everyone can understand, a small data requirement, quasi automatic identification of product families and detection of machines that are under or over capacity.

Read the aerospace case study
Steel industry

NLMK Clabecq

NLMK management and AMIA consultants developed and implemented a specific track and trace solution to locate and follow steel plates while assigning efficient storage locations.

Output capacity20% increase
Average output time50% reduction
Inventory reliability99.9%

Keys to success: designing the solution jointly with all stakeholders, change management tools, logistic and Lean experience, and the ability to demonstrate benefits and adapt to obstacles.

Read the steel project
Automotive industry

Production change programme

Our partner, the change management project leader, asked AMIA Systems for help in achieving the goals fixed by the customer. Their usual Lean tools reached half of the goal; with SIMOGGA the project requirement was met in full.

Workflows11% decrease
Working hours700 saved per year

Keys to success: software usability, acceleration of the change process, 2D factory layouts everyone can understand, immediate assessment of KPIs, a small data requirement and automatic identification of product families.

Read related articles

Want a case comparable to yours?

Tell us which constraint matters most and we will share the closest reference from our work.